Blog
KED.energy Launches 60kW DC Fast Charger at Coiliwood Midtown

KED.energy is pleased to announce that our newest charging site is now live at Coiliwood Midtown, bringing 60kW DC fast charging to residents, visitors and EV drivers in the area.
What’s installed
- 60kW DC fast charger with two CCS2 connectors
- Dedicated EV charging bays (lots 16 and 17), clearly marked in green, so drivers can charge without competing for space
- Easy start and stop, through the all-new KED app or the on-charger instructions
- Emergency stop button and clear on-site signage at the charging bays
Find us
Coiliwood Midtown, [address / car park level], Singapore [postal code]
Charger available [24 hours / operating hours]
How to charge
- Park in a marked EV charging bay and plug in the CCS2 connector.
- Start your session with the KED app. Search “KED Energy” on the App Store or Google Play, or scan the QR code on the charger.
- When you’re done, stop charging in the app or on the charger, then unplug.
Growing our network across Singapore
Every KED charger is OEM-built with our partner Zenova. Each new location brings us closer to a reliable, convenient charging network across the island. Thank you to the Coiliwood Midtown management and everyone who helped with the installation and commissioning.
Download the KED app and charge at Coiliwood Midtown today. [App Store link] · [Google Play link]
Charging towards sustainability. Energising Our World.